Rochester, New York
Client: Hanlon Architects
Design Challenges…Met
This project consisted of ten operating rooms, two procedure rooms, and over 50 pre-op, post-op, and PACU rooms. HVAC systems consisted of a central station VAV with hot water reheat. Medical gases included oxygen, nitrous and vacuum. A Material Processing space was equipped with cart washers, washer/disinfectors, sterilizers, and other equipment. A central steam plant provided steam required for the sterilization equipment. A 300 kW emergency generator provided life safety, critical and equipment branch emergency power.