Time Warner Cable Power Distribution

Time Warner Cable Power Distribution

Rochester, New York

Client: Time Warner Cable, Harry Goldberg

Design Challenges…Met

This project included the design of a new electric service, a 3,200 ampere paralleling switchboard, and capacity for up to (5) 750 kW emergency generators, two sets of two 400 kW paralleled UPS units, and dual path critical power distribution to the existing equipment racks.

August 18, 2014