Rochester, New York
Client: FRA Engineering, Pat Waterman
Design Challenges…Met
Design of electrical systems, including lighting, normal and emergency power distribution, and connection of traffic control equipment.
We worked closely with the structural engineer to determine methods of installing raceway systems to coordinate with the structural system.
We also worked with the traffic control equipment supplier to determine power and control wiring and raceway requirements, so this equipment could be roughed into the concrete prior to the equipment installation.